Contact us
Hunan Jindingsaisi Electronic Instrument Technology Co.,Ltd.

Tel:
0737-888 1828,0755-2771 6546

Mobile:
137 2557 4173

Contacts:
Mr. Li

Email:
jdss28@163.com

Headquarters factory:
31 Dong Taosheng Road, Taojiang County Economic Development Zone, Yiyang, Hunan

Domestic:Changsha Market Department

Add:
HX Building No. 403, labor West Road, Yuhua District, Changsha, Hunan

Domestic:Shenzhen Market Department

Add:
The Xinbao industrial and trade building in the Post Pavilion community of Sha Jing, Baoan, Shenzhen

The cold and heat shock test box is also known as the high temperature impact test box or the temperature impact test box. It is a high precision and high performance environmental testing equipment. In order to make your cold and hot impact test box have better working efficiency and longer service life, remind you to refer to the following cold and hot impact test box daily maintenance requirements and principles.

First, in order to ensure mechanical equipment often is in good technical condition, ready to be put into operation, reduce downtime, improve the mechanical intact rate and utilization rate, reduce mechanical wear, prolong the service life of the machine, reduce the mechanical operation and maintenance costs to ensure production safety, must strengthen the thermal shock test box equipment maintenance work;

Two, maintenance must carry out the principle of "maintenance and emphasis, prevention first", and make regular maintenance and compulsory operation, correctly handle the relationship between use, maintenance and repair, and do not allow only no maintenance, but only maintenance.

Three, all teams must do all kinds of machinery maintenance according to the mechanical maintenance regulations and maintenance categories. They can not be delayed without any reason. Special circumstances need to be approved by the special workers, but then they can be postponed for maintenance.

Four, the cold and hot impact test box maintenance machinery to ensure the quality, according to the specified items and requirements, must be carried out item by item, no leakage or not insured. The problems found in the maintenance project, the quality of maintenance and the maintenance should be recorded and reported to the Department.