Contact us
Hunan Jindingsaisi Electronic Instrument Technology Co.,Ltd.

Tel:
0737-888 1828,0755-2771 6546

Mobile:
137 2557 4173

Contacts:
Mr. Li

Email:
jdss28@163.com

Headquarters factory:
31 Dong Taosheng Road, Taojiang County Economic Development Zone, Yiyang, Hunan

Domestic:Changsha Market Department

Add:
HX Building No. 403, labor West Road, Yuhua District, Changsha, Hunan

Domestic:Shenzhen Market Department

Add:
The Xinbao industrial and trade building in the Post Pavilion community of Sha Jing, Baoan, Shenzhen

Acupuncture test instrument for lithium battery
  • Details
  • Battery needle test machine / needle tester / needle detector, battery testing machine - professional production, high and new technology enterprise certification

    Conforming to standard:

    1. SJ/T11169-1998 or UL1642-2007

    2. SJ/T11170-1998 or UL2054

    3. MH/T1020-2007 or UN38.3、GB/T18287-2000

    4. GB/T18287-200X

    5. YD1268-2003

    6. QB/T2502-2000

    7. SJ/TXXXX-200X

    8. IEC62281-2004

    Name: a lithium battery needle detector

    Model: BE-9002

    Specification:

    1、ф2mm—ф8mm High temperature resistant steel needle (steel needle, tungsten needle) can be changed

    2、以10—40mm/s Speed, from the direction perpendicular to the battery plate (the needle stays in the battery)

    3、Perforation:150~200KG

    4、Make a box type equipment

    Lithium battery needle detector, acupuncture test machine, needle test machine, needle detector, battery test machine, puncture test machine

    Lithium battery assessment test project

    Definition

    Full charge: to achieve the specified capacity of the manufacturer, charge the battery under the manufacturer's recommended charging conditions (including current, voltage, temperature, time, etc.). Furthermore, the time required for the battery is within a week after the charge.

    Complete discharge: discharge under the recommended discharge conditions (including current, temperature, etc.) by the manufacturer, and on the battery according to the specified discharge voltage. And the time required for the battery is within a week after the discharge.

    A newly produced battery: the requirement for the battery is less than a month after production and is accepted less than the XX charging cycle.

    Battery cycle: according to the manufacturer's recommended conditions, the battery is continuously charged and discharged, and the discharge capacity of the battery has been reduced by 40% to 60% at the manufacturer's designated capacity.

    Indoor temperature: in the test, the room temperature is 20 + 5 degrees, which is the temperature in the ordinary room. The setting value is based on a simple test environment.

    Explosion: an explosion is an explosion or damage to the inside of the battery or the part of the battery shell that is split open.

    Fire: fire is caused by spontaneous combustion or burning inside the battery.

    Safety valve operation: the meaning of the operation of the safety valve refers to the discharge of the battery during the normal use of the battery (releasing the internal pressure of the battery to the outside world).

    Deformation: the deformation refers to the visible and visible deformation of the cell caused by external pressure or internal pressure.

    Evaluation test project

    (1)Electrical test

    Standard test method standard for battery condition temperature assessment of test items

    1. The external short circuit is fully charged. The newly produced battery is at room temperature of 60 degrees, and the wire with resistance less than 50m ohm is short circuited for 6 hours.

    2. Full charge discharge completely recharged the battery at the normal room temperature at the normal room temperature of the factory recommended by the manufacturer to force the depth discharge calculation capacity of 250%. * If the safety or protection function is achieved during the test, the test of no explosion and no fire can be terminated.

    3. Continuous charging, full discharge, just finished battery, normal room temperature, according to the method recommended by the manufacturer, and at the specified voltage for 28 days, no explosion, no fire and no split.

    4. Full discharge of overcharge and full discharge at the normal room temperature of the battery is charged to 250% of the calculated capacity by the current recommended by the manufacturer. * if the safety or protection function is achieved during the test, the test of no explosion and no fire can be terminated.

    5. Main current is fully charged. The battery is completely discharged. The battery that has just been finished is at normal room temperature. The battery charge is 3 times the current recommended by the manufacturer, and the current is charged to the battery. The capacity of the battery is over 100%, no explosion and no fire.

    (2)Mechanical performance test

    Standard test method standard for battery condition temperature assessment of test items

    1. The whole battery is fully charged or discharged completely. The battery will vibrate 90 to 100 minutes in three directions of XYZ at room temperature, the amplitude is 0.8mm, the frequency is 10HZ, and the frequency change rate is 1HZ/min. After the test, the full discharge battery will be charged to the full capacity recommended by the manufacturer. No explosion, no fire, no deformation

    2. The acceleration is completely charged or fully discharged. The battery that has just been produced is normal at room temperature. It accelerates in the initial 3 milliseconds in time. The average acceleration is 75g (G is the acceleration unit of gravity), and it reaches 125-175g when it reaches the peak. Vibrate in the direction of each XYZ perpendicular to each other. After the test, the full discharge battery will be charged to the manufacturer's recommended capacity. No explosion, no fire, no deformation

    3. The battery that has been completely charged or fully discharged at the normal room temperature is free to drop 10 times from the 1.9m high to the cement ground. After the test, the full discharge battery will be charged to the manufacturer's recommended capacity. No explosion, no fire phenomenon (small battery drop test machine BE-F-320S, Baer brand)

    4. Nails are completely charged through the battery and are fully charged at the normal room temperature of the battery. The nail in diameter 2.5 to 5mm passes through the longitudinal axis of the battery and puts the nail into the battery 6h. No explosion, no ignition (battery needle test machine BE-9002)

    5. Squeeze and recharge the battery that is just finished, and put the battery into two flat iron plates at normal room temperature, so that the vertical axis of the battery is parallel to the flat iron plate. Then the 13kN pressure is applied to the battery without explosion and no fire. (battery extruder, BE-6045).

    6. Hit the battery at normal room temperature with a cylindrical stick (7.9MM diameter) over the top of the battery and perpendicular to the longitudinal axis of the battery. 9.1kg has a considerable weight falling down from 61cm. No explosion, no ignition (battery impact test machine BE-6045)

    7. 10m falls completely at the normal room temperature of the battery that has just finished and will drop the battery to the cement ground at a high level of 10m. No explosion, no fire

    (3)Environmental performance test

    Standard test method standard for battery condition temperature assessment of test items

    1. high temperature storage battery is fully charged just finished production (a) at a temperature of 100 DEG C oven stored in 5 hours after the battery at the temperature of 20 DEG place 24h (b) at 60 DEG C oven after 30 days storage battery will be placed at a temperature of 20 DEG C where no explosion, no 24 hours the phenomenon of the fire

    2., the heat conflict is fully charged, and the newly completed battery passes through 10 consecutive cycles within 2 hours at the temperature of -20 C and 40 C to shift the battery from -20 to 60 C, and the replacement time does not explode, no ignition, no damage and no deformation in 5 minutes.

    3., low voltage fully charged, just finished battery. At room temperature, the battery is placed at absolute pressure equal to or less than 11.6kpa, time is 6 hours, no explosion and no fire.

    (3) II environmental performance test (improper behavior)

    Standard test method standard for battery condition temperature assessment of test items

    4. heat is heated and the battery is completely recharged and the battery is put into the oven at a rate of 5 + 2 / min until 130. Put the battery in the oven for about 60 minutes. No explosion, no fire

    5. drop into the water and completely recharge the battery at room temperature and immerse the battery in the water (room temperature) for 24 hours without explosion and fire.